Quarterly Activities/Appendix 5B Cash Flow Report
Original announcement
Open in new tabHaving trouble viewing? Open the original PDF.
At a glance
AI-generated summary. Refer to the original PDF for the complete announcement.
Pivotal Metals released a maiden Scoping Study for its 100%-owned Horden Lake copper project in Québec, showing a post-tax NPV7 of A$920M and 49% IRR, while growing the Horden Lake mineral resource to 549 kt contained CuEq and advancing drilling at Belleterre, ending the quarter with $2.444m cash.
- The Horden Lake Scoping Study delivered a post-tax NPV7 of A$920M and IRR of 49% at base case pricing (A$1,343M and 63% at spot pricing), with capital payback in 1.3 years from first ore.
- The Horden Lake Mineral Resource Estimate grew to 52 Mt @ 1.05% CuEq for 549 kt contained CuEq, with in-pit CuEq up 40% to 485 kt CuEq.
- A second locked cycle metallurgical test recovered 90.5% Cu into a clean 25.7% Cu concentrate.
- Five diamond drill holes (988m) were completed at Lorraine Mine East at Belleterre, with assays from the first three holes released post quarter-end.
- Pivotal expanded its Belleterre ground position by 25% through an option to earn-in 100% of the Bambino project.
- Cash balance at 30 September 2026 was $2.444m, with exploration expenditure of $0.861m during the quarter.
Post-tax NPV7 (base case)
A$920Mp.1
Post-tax IRR (base case)
49%p.1
Post-tax NPV7 (spot pricing)
A$1,343Mp.1
Post-tax IRR (spot pricing)
63%p.1
Capital payback from first ore
1.3 yearsp.1
Pre-production capital (net)
A$411Mp.1
LoM AISC
US$1.00/lb Cup.1
Horden Lake MRE total
52 Mt @ 1.05% CuEq for 549 kt contained CuEqp.1
In-pit CuEq
485 kt CuEq (45 mt @ 1.07% CuEq)p.1
In-pit contained Cu
292 ktp.1
Second LCT copper recovery
90.5% Cu into 25.7% Cu concentratep.1
Lorraine Mine East drilling
five holes (988 m)p.1
Cash balance at 30 September 2026
$2.444mp.1
Exploration expenditure for the quarter
$0.861mp.15
Corporate and other expenditure for the quarter
$0.079mp.15
Payments to Directors/related parties
$0.090mp.15
Total securities on issue
1,424,973,382p.15
The Scoping Study establishes Horden Lake as a potentially high-return, low capital intensity copper development with substantial by-product credits, though the mine plan currently uses only a subset of the total resource and the deposit remains open along strike and at depth. The Company is pursuing further drilling, engineering and non-equity financing options to advance the project, while continuing exploration at Belleterre to test multiple new targets. The cash position of $2.444m, against quarterly outgoings, indicates the Company will likely need continued funding or strategic initiatives to support ongoing activities.
Announcement text
Text extracted from the announcement for easier reading. View the original PDF for all figures, tables and formatting.
QUARTERLY ACTIVITIES REPORT & APPENDIX 5Bp.1
Activity Across Québec Exploration and Development Projects, During the Quarter ended 30 September 2026p.1
Quarter Highlightsp.1
- Horden Lake Scoping Study confirms strong copper development potential
- Post-tax NPV7 of A$920M and IRR of 49% (A$1,343M / 63% at spot pricing)
- Capital payback in 1.3 years from first ore, on pre-production capital of A$411M (net)
- Very low cost: AISC of US$1.00/lb Cu, net of by-product credits
- 29 kt CuEq average annual production (Years 1–8), 247 kt CuEq over an initial 10-year life
- Low capital intensity of US$14,127/t Cu, vs global average of US$22,359/t Cu
- Mine plan uses a subset of the MRE – growth potential through resource conversion and extensions
- Horden Lake MRE grows to 52 Mt @ 1.05% CuEq for 549 kt contained CuEq
- In-pit CuEq up 40% to 485 kt CuEq (45 mt @ 1.07% CuEq); copper dominant with 292 kt contained Cu
- Substantial by-product credits: 237 koz Au, 17 Moz Ag and 312 koz Pd + Pt
- Deposit open along its 2,800 m strike and at depth – much of the conductive horizon untested
- Horden Lake metallurgy confirms high copper recoveries into clean concentrates
- Second locked cycle test recovered 90.5% Cu into a clean 25.7% Cu concentrate + byproduct credits
- Belleterre drilling tests multiple new targets
- Lorraine Mine East: five holes (988 m) completed on never-drilled IP targets next to the historic Lorraine Mine – Assays from first 3 holes extend the trend.
- Shanty Lake: DHEM refines a shallower, more conductive target – remains untested by drilling
- LaForce: IP reinterpretation defines a 1.4km untested trend (post quarter-end)
- 25% expansion of the Belleterre ground position, via the Bambino 100% earn-in
- Cash balance at 30 September 2026 of $2.444m, supporting continued news flow
- Q1 drilling at Horden Lake
- Strategic initiatives to surface the significant value defined at Horden Lake
- Pending assays and continued exploration including November IP survey at Bambino
Managing Director Ivan Fairhall said: "Our maiden Scoping Study is a defining milestone for Pivotal, establishing Horden Lake as a high-value copper development project. The Study outlines a post-tax NPV7 of A$920 million and a 49% IRR at base case pricing, rising to A$1,343 million and 63% at spot, with capital paid back in just 1.3 years from first ore. A simple open pit, a conventional flotation flowsheet low capital and operating cost intensity. With average production of almost 30kt CuEq per annum in a Tier-1 jurisdiction, Horden Lake is a strategically important asset at a time when the market needs new copper supply. Importantly, the Study captures only part of the opportunity. The mine plan draws on a subset of our 549kt CuEq resource, and the deposit remains open, with large conductors still undrilled. At Belleterre, we completed drilling at Lorraine Mine and refined the Shanty Lake target as we continue the search for new discoveries. We remain focused on the exploration opportunity at both Belleterre, as well as Horden Lake – in parallel with surfacing the significant strategic value now clearly evident at Horden Lake"p.1
HORDEN LAKEp.2
During the quarter, the Company delivered significant value enhancing progress on its 100% owned Horden Lake Project, in Québec, Canada. The enlarged MRE and positive metallurgical testwork supported an outstanding maiden scoping study that showed Horden Lake is a simple high returns copper project, with significant upside.p.2
Scoping Studyp.2
On 29 September 2026, Pivotal released the results of its maiden Scoping Study for Horden Lake (the Study). The Project delivers total production of 247 kt CuEq over an initial 10-year life, with the first 8 years averaging 29 kt CuEq per annum (19 kt CuEq), at an All-In Sustaining Cost (AISC) of approximately US$1.00/lb Cu net of by-product credits. Key outcomes are summarised in Table 1.p.2
Table 1: Scoping Study summary metrics
p.2| Financials | Base Pricing | Spot Pricing |
|---|---|---|
| Production (kt CuEq per annum) | 29.1 | 28.1 |
| Copper price (US$/lb) | 5.50 | 6.78 |
| Net revenue (A$M, LoM) | 4,434 | 5,278 |
| Pre-tax NPV7 (A$M) | 1,333 | 1,961 |
| Pre-tax IRR (%) | 56% | 75% |
| Post-tax NPV7 (A$M) | 920 | 1,343 |
| Post-tax IRR (%) | 49% | 63% |
| Payback from first ore (years) | 1.3 | 1.0 |
| LoM AISC (US$/lb Cu, net of by-product credits) | 1.00 | 0.71 |
| Pre-production capital, net (A$M) | 411 | 411 |
Pre-production capital is net of the CTM-ITC refundable tax credit (A$17M). Base case (USD): Cu 5.5/lb, Ni 7.25/lb, Au 3,775/oz, Ag 58/oz, Pd 1,255/oz, Pt 1,600/oz, Co 20/lb. Spot case (USD): Cu 6.78/lb, Ni 7.4/lb, Au 4,365/oz, Ag 67/oz, Pd 1,300/oz, Pt 1,782/oz, Co 20/lb. FX AUD/CAD 0.91x, CAD/USD 0.72x.p.2
Key highlightsp.2
- Compelling economics: post-tax NPV7 of A$920M and IRR of 49% at base case pricing (A$1,343M and 63% at spot), with capital payback in 1.3 years from first ore and a 2.2x post-tax NPV to capex ratio.
- Strategically important: average production of 29 kt CuEq per annum is a mid-scale copper development opportunity, with low capital intensity of US$14,127/t Cu (US$9,261/t CuEq) versus a global development-stage average of US$22,359/t Cu.
- Substantial by-product credits: over A$1 billion of precious metal and PGM revenue, providing alternative financing options and a cyclical hedge, and driving a net of byproduct AISC of US$1.00/lb CuEq.
- Low-risk development: a conventional open pit and flotation project producing two clean concentrates, with access to an established workforce, highway and grid hydropower, and a clear permitting pathway with no major development impediments identified.
- Significant upside: the mine plan uses only part of the MRE, inferred material is limited to 30% of NSR, and the deposit remains open in multiple directions with a large undrilled conductive horizon.
The Project's strong early cash generation is driven a low capital intensity and favourable grade and deposit geometry (Figure 1).p.2
Bar and line chart showing annual EBITDA, development capex, sustaining capex and tax paid across Year -1 to Year 11, with annual cash flow values 438, 352, 306, 252, 284, 307, 306, 391, 89, 31 for Years 1-10, and cumulative free cash flow lines under base and spot pricing scenarios rising to around 700 and 1,800 AUD M respectively.
Mining and Production Targetp.3
The scoping study 'Production Target' is based on a single open pit mined by conventional truck-and-shovel methods and processed through a central plant. Scoping-level mine planning was completed by Moose Mountain Technical Services (MMTS). The mine plan delivers 34 Mt of mill feed and 269 Mt of waste over an 11-year period, for a life-of-mine strip ratio of 7.9:1 (Figure 2).p.3
Higher-grade Measured and Indicated material is scheduled preferentially in the early years to accelerate capital payback, with lower-grade material stockpiled and processed at the end of the mine life. The pit was optimised using a US$5.50/lb copper price, with mill feed selected on a net smelter return (NSR) basis. Pivotal notes that estimated mining costs (<$3/t) are significantly lower than those assumed in the optimisation (C$4/t), implying potential upside in future studies should inferred resources be upgraded.p.3
The life-of-mine NSR contribution from Inferred Mineral Resources has been limited to 30%. Approximately 14% of NSR during the 1.3-year payback period is attributable to Inferred material. In the Competent Person's opinion, the inclusion of Inferred Resources is not a determining factor in project viability.p.3
3D isometric view of the Horden Lake open pit mine shell (cyan surface) overlaid on the block model grade shell, with a scale bar of 0-625 and north-up orientation indicator, looking east along the deposit.
Processing, Products and Marketingp.4
The concentrator is a conventional crush–grind–float plant treating 3.5 Mtpa, using well-established technology with no novel or unproven process steps. Grade-based recovery algorithms for all seven payable elements were derived from 17 metallurgical samples and two locked cycle tests, with life-of-mine copper recovery of 92%.p.4
The flowsheet produces two clean, conventionally saleable products: a copper concentrate (24% Cu design grade, 83% of NSR) carrying payable gold, silver and palladium credits, and a nickel concentrate (10% Ni, 17% of NSR) with a significant cobalt credit (Figure 3). Life-of-mine payable production totals 160 kt Cu, 20 kt Ni, 83 koz Au, 5.9 Moz Ag and 32 koz Pd+Pt. Feedback from concentrate buyers has confirmed the products are clean, widely marketable and globally competitive, with no material penalty elements identified. The Project is approximately 300 km by road from Canada's only copper smelter (Horne) and 540 km from the Sudbury nickel smelters, with an intermodal rail head at Matagami (200km) providing access to east and west coast ports. No binding offtake is in place, preserving flexibility for offtake-linked financing.p.4
Two pie charts: left chart shows NSR by concentrate split 83% Copper and 17% Nickel; right chart shows NSR by metal split Copper 65%, Nickel 10%, Gold 10%, Silver 11%, Cobalt 1.5% and PGM 1.4%.
Infrastructurep.4
Horden Lake is located approximately 10 km from the all-weather James Bay (Billy Diamond) Highway. Low-cost (C$0.05/kWh), low-emission grid hydropower will be supplied via a 42 km 138 kV spur line, assumed to be delivered under an infrastructure tolling model. Site demand is estimated at approximately 15 MW. A fully lined tailings storage facility, designed by Knight Piésold, is integrated within the waste rock dump for buttressing and intrinsic safety. A permanent 200-person camp will support a drive-in workforce.p.4
Capital and Operating Costsp.4
Pre-production capital is estimated at A$428M (A$411M net of the CTM-ITC tax credit), including A$75M contingency, with a net life-of-mine capital cost of A$740M (Table 2). Life-of-mine operating costs total A$49.3/t ROM (Table 3), including concentrate transport. Unit costs benefit from bulk open pit mining with short hauls, a conventional flowsheet, low-cost power and direct highway access. Future studies will evaluate a phased development to reduce up-front capital.p.4
Table 2: Capital cost summary
p.5| Area | Pre-Production AUDm | Sustaining AUDm | Total LoM AUDm |
|---|---|---|---|
| Mining Equipment and Facilities | 47 | 206 | 253 |
| Mining Pre-strip | 14 | - | 14 |
| Process Plant | 174 | - | 174 |
| Infrastructure | 12 | - | 12 |
| Tailings & Waste Rock | 19 | 89 | 108 |
| Closure | - | 38 | 38 |
| Total Direct Costs | 266 | 334 | 599 |
| Project Delivery | 59 | - | 59 |
| Owners Costs | 28 | - | 28 |
| Total Indirect Costs | 88 | - | 88 |
| Contingency | 75 | 38 | 113 |
| Total Capital Cost | 428 | 372 | 800 |
| CSM ITC Tax Credit* | (17) | (26) | (44) |
| Salvage Value | - | (16) | (16) |
| Total Net Capital Costs | 411 | 329 | 740 |
Table 3: Operating costs summary
p.5| Operating Costs & Margins | LoM AUDm | AUD/t ROM LoM |
|---|---|---|
| Mining* | 906 | 26.6 |
| Processing | 463 | 13.6 |
| G&A | 227 | 6.7 |
| Concentrate transport | 81 | 2.4 |
| Total operating costs | 1,677 | 49.3 |
Taxation and Incentivesp.5
The financial model applies federal and Québec corporate income tax and the Québec mining tax. It incorporates the federal 'Productivity Mega Deduction' announced on 15 September 2026, which allows immediate expensing of eligible capital, and an estimated A$44M refundable Clean Technology Manufacturing Investment Tax Credit (CTM-ITC). Taxation outcomes remain preliminary.p.5
Exploration and Growth Upsidep.5
The Production Target uses only a subset of the 52 Mt @ 1.05% CuEq MRE. Converting Inferred material, including material outside the scoping study mine plan, represents a low-risk source of production target growth. Beyond the mine plan, the deposit is constrained by drilling rather than geology: it extends more than 2,800 m along strike, is open along strike and at depth, and only eight holes have tested the Contact Zone below 300 m vertical – all of which intersected mineralisation.p.5
Electromagnetic surveys have defined an extensive network of conductors that mimic the Horden Lake signature (Figure 4). The 40% growth in in-pit contained CuEq in the 2026 MRE was heavily driven by drilling a shallow along strike moderately conductive target, validating the targeting model and leaving a pipeline of untested priority targets with higher conductivity.p.5
Long-section view looking southeast showing the 2,800m strike length, the scoping pit shell, the 2026 MRE block model, and large maroon EM conductor plates extending below and beyond the drilled and modelled resource, with annotations noting north and south flanks undrilled below 200-250m, only 8 holes below 300m, deepest drilling about 540m, and conductors extending 2-3x deeper than drilling.
Next Stepsp.6
Pivotal intends to continue growing the Horden Lake Mineral Resource with drilling planned for upcoming winter field season. The program is expected to be a combination of step-out drilling to grow the deposit envelope, as well as infill to convert inferred mineralisation supporting an enlarged production target from already defined resources. With the mine plan drawing on only a subset of the MRE and the deposit open along strike and at depth, this work provides a clear pathway to extend and scale and attractiveness of the project.p.6
In parallel, the Company intends to advance engineering, permitting and community engagement to progress the development timeline – building on the strategic value defined within the study.p.6
Pivotal has appointed a strategic adviser to assess non-equity financing opportunities to leverage this strategic value. The process is advancing - Pivotal will keep the market informed as necessary, and views the funding outlook favourably, supported by high returns on capital, low capital intensity, modest absolute capital, by-product credits suited to streaming, unencumbered offtake and 100% ownership of the Project.p.6
Mineral Resource Updatep.6
On July 6, the Company announced a significant update to its mineral resource estimate (MRE), which was incorporated into the scoping study delivered within the same quarter.p.6
The Horden Lake MRE now totals 52 Mt at 1.05% copper-equivalent (CuEq), for 549 kt of contained CuEq metal (Figure 5). Copper is overwhelmingly the dominant metal in the Resource (290 kt contained Cu metal), of which 87% falls into a pit-constrained resource.p.6
3D view of the Horden Lake deposit showing the open pit MRE of 46mt ($25/t cutoff) in green at surface and the underground MRE of 7mt ($65/t cutoff) below, along a 2,800m strike.
Table 4: Horden Lake 2026 Mineral Resource Estimate Statement
p.7| Category | Tonnes Mt | CuEq % | Cu % | Ni % | 3E g/t | Ag g/t | Co ppm | CuEq kt | Cu kt | Ni kt | 3E koz | Ag koz | Co t |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Open Pit* | 45.5 | 1.07 | 0.56 | 0.17 | 0.34 | 10.5 | 134 | 485 | 257 | 79 | 494 | 15,336 | 6,121 |
| Underground^ | 6.9 | 0.93 | 0.51 | 0.18 | 0.25 | 8.5 | 130 | 64 | 35 | 12 | 55 | 1,872 | 898 |
| Total | 52.4 | 1.05 | 0.56 | 0.17 | 0.33 | 10.2 | 134 | 549 | 292 | 91 | 549 | 17,208 | 7,019 |
| M&I | 24.3 | 1.17 | 0.67 | 0.18 | 0.34 | 9.2 | 143 | 283 | 163 | 45 | 262 | 7,175 | 3,478 |
| Inferred | 28.1 | 0.95 | 0.46 | 0.16 | 0.32 | 11.1 | 126 | 266 | 129 | 46 | 288 | 10,033 | 3,540 |
| Total (classification) | 52.4 | 1.05 | 0.56 | 0.17 | 0.33 | 10.2 | 134 | 549 | 292 | 91 | 549 | 17,208 | 7,019 |
The MRE has been prepared in accordance with the 2012 Edition of the JORC Code by independent consultants Caracle Creek International Consulting Inc. ("Caracle Creek") and its sub-consultant, Atticus Geoscience Consulting S.A.C. ("Atticus"), and has an effective date of 15 June 2026 ("Effective Date").p.7
The Horden Lake Deposit (the "Deposit") extends more than 2,800 m along strike, and has been intersected at its deepest point, about 540 m vertical or 660 m down-dip along the intrusive footwall-sedimentary country rock contact zone (the "Contact Zone").p.7
The updated resource estimate demonstrates a large increase in the Project size and, of particular importance, significant growth of pit-constrained resources, showing strong potential for a substantial open pit mine development scenario.p.7
- 45 Mt constrained within a pit shell, meaning potential for an open pit mine with a meaningful mine life and economies of scale.
- 257 kt in-pit contained Cu metal, an increase of 30% over the previous MRE.
- 485 kt in-pit contained CuEq metal, an increase of 40% over the previous MRE.
- Significant quantities of contained by-products: 237 koz gold, 17 Moz silver, 312 koz palladium + platinum and 7 kt cobalt.
The ability for the by-products to be recovered and sold has been well demonstrated in recent metallurgical testwork, where clean high-grade concentrates have been produced from a conventional flotation flowsheet. The CuEq calculation accounts for expected recoveries of each metal as evidenced in testwork, and results in a by-products contribution that is realistically stated as 'equivalent' to 257 kt of additional contained copper metal.p.8
Growth Upsidep.8
Since acquisition in 2022, Pivotal has demonstrated strong resource growth of the deposit, having almost doubled the MRE tonnage whilst maintaining a consistent CuEq grade.p.8
Stacked bar chart showing M&I and Inferred tonnes for 2022, 2025 and 2026 with an overlaid CuEq grade line, annotated with '88% CuEq Growth + 257 kt CuEq' arrow from 2022 to 2026.
Despite this success, there is significant exploration growth potential remaining. The deposit is constrained by a lack of drilling, and is open along its entire strike length and at depth.p.8
- To date, every single hole intersecting the Contact Zone has encountered mineralisation.
- There are only 8 holes penetrating the Contact Zone deeper than 300 m vertical.
- Only 7 out of >200 holes drilled into the Contact Zone do not directly contribute to the MRE, 4 of which are drilled in an isolated area on the southern Property boundary.
Long-section with colour-coded drill hole traces and extensive maroon EM conductor plates extending beyond the drilled and modelled resource envelope.
The Deposit occurs as remobilised concentrations of polymetallic sulphide accumulations along the Contact Zone, between mafic intrusive and metasedimentary rocks; mineralisation is known to be highly conductive. Recent electromagnetic (EM) surveys have defined an extensive matrix of interconnecting conductors that mimic the "Horden Lake signature", strongly implying extensive down plunge and along strike extensions of resources. To date there has been no identified graphite or barren sulphides on the Contact Zone, meaning conductors are low risk of being 'false' and present as high conviction drill targets.p.9
Metallurgical Testworkp.9
During the quarter, Pivotal announced results from Phase 2 metallurgical testwork at Horden Lake, building on the strong Phase 1 results reported in 2025. The program expanded the metallurgical database to 17 samples spanning a wide range of feed grades, including end-member precious metal samples, medium- and low-sulphur samples and a copper-rich sample, together with a second locked cycle test (LCT) on a composite representative of expected early copper feed grades. Combined with earlier test data, the results have been used to develop algorithms that estimate recoveries of all seven payable metals as a function of head grade, materially improving the quality of inputs to mine planning and the scoping study.p.9
Copper metallurgy and selectivity improved further using the same simple, conventional flotation flowsheet, which remains unchanged. The second LCT recovered 90.5% Cu into a clean, high-grade concentrate grading 25.7% Cu, 293 g/t Ag, 1.99 g/t Au and 2.48 g/t Pd. Nickel reporting to the copper concentrate continues to be reliably rejected, with little impact on copper recovery or concentrate quality.p.9
- Copper: 92% total recovery – 88% to a clean, high-grade 24% Cu concentrate plus 4% payable in the nickel concentrate
- Nickel: 46% recovery to a high-grade 10.7% Ni concentrate
- Gold: 61% total recovery, majority reporting to the copper
- Silver: 73% total recovery, majority reporting to the copper
- Palladium: 60% recovery
- Platinum: 29% recovery
- Cobalt: 42% total recovery
Nickel metallurgy remains the focus of ongoing optimisation, focusing on liberating the pentlandite and selectively floating it from pyrrhotite (which has a detrimental impact on concentrate grade). Modest Ni recoveries reflect the simple flowsheet employed and as supported by the testwork to date.p.10
Sulphur grade is used as the primary predictor of nickel recovery. Notably, the in-pit MRE sulphur grade of 3.6% S is well below the 6.5% S of the LCT composite, and batch testwork indicates significantly better kinetics in lower-sulphur samples.p.10
Process flow diagram showing mill feed progressing through primary grind, pre-aeration, copper/nickel rougher flotation, concentrate regrind, and separate copper and nickel cleaner circuits (1 through 3), producing copper concentrate, nickel concentrate, rougher tails and cleaner tails.
Feedback from traders confirms the byproduct metals suite is generally above payable thresholds, and both concentrates remain highly attractive given the absence of penalty elements. The demonstrated recovery of gold, silver, palladium and platinum into saleable concentrates also supports the Company's ongoing assessment of alternative, non-dilutive financing pathways such as precious metals streaming.p.10
These metallurgical results were used in the scoping study released 29 September 2026.p.10
BELLETERREp.10
During the quarter, Pivotal advanced exploration across the 100%-owned Belleterre Projects in Québec, Canada. Assays and a follow-up downhole EM (DHEM) survey were completed at Shanty Lake, and drilling was completed at Lorraine Mine East (first assays released subsequent to quarter end). The Company also increased its footprint by 25% through the option to earn-in to 100% of the Bambino project, which further consolidates the broader Midrim project area. Exploration remains ongoing.p.10
Shanty Lakep.10
The Shanty Lake magmatic sulphide Cu-Ni target lies between the Blondeau and Kelly Lake gabbro hosted Cu-Ni deposits. Pivotal's 2025 FLTEM survey identified a large 400m x 150m steeply dipping bedrock conductor starting from 150m depth (refer ASX announcement dated 25 Aug 2025).p.10
This untested conductive target is flanked by gabbro bodies disrupting narrow iron formations within predominantly mafic volcanic sequences where historic drill holes intersected anomalous Cu and Ni. The target was defined by a combination of known prospective host environment, established mineralisation, VTEM conductor, and FLTEM conductor.p.11
Hole 26-PIV-08 (679m) was designed to test the centre of the conductor modelled from the surface FLTEM survey. The hole did not return a significant assay result, although core samples returned elevated metal values of up to 1,065 ppm Cu in iron formation and up to 1,640 ppm Zn in mafic volcanics, confirming an active mineralising system. A follow-up DHEM survey indicates the hole passed beneath the conductor. The conductor is now modelled as a 350m x 140m plate with significantly higher conductivity (200–750 Siemens, compared with 70–160 Siemens originally modelled), positioned shallower than the original surface interpretation. The Shanty Lake conductor remains untested by drilling, and the refined model will be incorporated into the Company's wider Belleterre targeting and follow-up drilling program.p.11
Satellite plan map of the Shanty Lake target area showing drill collars, 2026 FLTEM and DHEM conductors, VTEM conductor stars, and nearby historic occurrences including Blondeau (0.8m @ 0.9% Cu, 2.2% Ni), Kelly Lake (1.4mt @ 0.7% Cu, 0.7% Ni, 0.3 g/t PGE inferred resource) and a boulder sample of 0.30% Cu, 1.16% Ni.
Cross-section looking west showing drill hole 26-PIV-08 intersecting near a newly modelled 350m x 140m DHEM conductor (blue) compared with the previously modelled FLTEM conductor (brown).
Lorraine Mine East – Drill Program Expansionp.12
During the quarter, the Company announced and completed an expansion of its diamond drilling program at Belleterre, targeting the Lorraine Mine East area. This extends the initial 1,800m Belleterre drill campaign, which was completed during the quarter. Five holes were drilled for 988m. Core was submitted to the laboratory during the quarter.p.12
Lorraine Mine East comprises priority targets defined by the Company's December 2025 Induced Polarisation (IP) survey, located immediately east of the past-producing Lorraine Mine (historic production of approximately 600kt @ 1.4% Cu, 0.6% Ni and 0.6 g/t Au, 1964–1968). None of the targets have been previously drill tested. The program is designed to test two mineralisation styles.p.12
- Magmatic Cu-Ni sulphide targets (LIP1, LIP2, LIP11): coincident high-chargeability, low-resistivity IP anomalies with positive magnetic signatures along the Lorraine gabbroic lithology, which extends approximately 3km east of the mined area. Historic results include surface samples up to 0.63% Cu and 0.93% Ni and drill intersected samples up to 0.56% Cu and 0.72% Ni; gabbro hosted.
- Vein-hosted Au-Cu targets (LIP3, LIP4, LIP5, LIP10): IP anomalies extending up to 1.8km east of the mine along the structural corridor that hosted high-grade historic underground channel sampling results, including 28m @ 45 g/t Au and 3.2% Cu, which remains largely untested outside the mined zone.
Drill targets are selected and prioritised based on their IP chargeability and resistivity characteristics with consideration for historic results including drilling, surface sampling and associated magnetic features.p.12
Plan map showing IP chargeability/resistivity anomaly targets LIP1 through LIP11 east of the past-producing Lorraine Mine, with historic drill hole and surface sample annotations including 600kt @ 1.4% Cu past production, 28m @ 45g/t Au & 3.2% Cu underground channels, and a prospective horizon extending over 1km east that is entirely undrilled.
Subsequent to quarter end, the Company released assays for the first three holes (26-PIV-09 to 26-PIV-11, 612m) (refer ASX announcement dated 30 October 2026). Each hole intersected sulphide-bearing rocks consistent with the targeted IP response. Host gabbro was intersected, and the copper and nickel mineralisation returned confirms a potential 1,000m strike length east of the Lorraine deposit. The best result was 2.4m @ 0.18% Cu, 0.06% Ni and 0.11 g/t Au from 154m in 26-PIV-09, with individual assays up to 0.332% Cu, 0.140% Ni, 2.51 g/t Ag and 0.29 g/t Au. Assays for 26-PIV-12 and 26-PIV-13, drilled a further 800m east, are expected by early December 2026.p.13
Bambino Acquisitionp.13
During the quarter, Pivotal entered into an option agreement to acquire 100% of the Bambino Project, a 57-claim, 3,320 ha property within the Belleterre-Angliers Greenstone Belt. Bambino is contiguous with the main Midrim area, and substantially surrounds Pivotal's existing Delphi-Patry and Zullo occurrences, consolidating the 'string of pearls' Midrim trend of high-grade Cu-Ni-PGM occurrences and materially expanding the prospective gabbro host.p.13
Historical exploration has demonstrated high-grade mineralisation on the Bambino trend, including:p.13
- 17.5m @ 0.86% Cu, 0.52% Ni & 0.53 g/t PGE from 38m (01-BT-40, Delphi-Patry), with individual results up to 6.77% Cu and 9.73% Ni
- 7m @ 1.6% Cu, 0.5% Ni & 0.79 g/t PGE from 127.5m (02-BT-61, Delphi-Patry)
- 0.15m @ 3.35% Cu & 1.37 g/t Au (48-Z-03, Zullo)
The area was last drilled in 2002, with historical work limited by fragmented ownership and concentrated around outcropping occurrences. Pivotal interprets a series of folded gabbroic sills, with the fold noses – low-pressure sites favourable for sulphide accumulation – as primary targets, and the fold limbs, supported by Cu-Ni soil anomalies, as secondary targets.p.14
Initial work completed includes compilation of historical data and geological mapping. Field work, including access, prospecting and mapping, has commenced, and a 60 line-km IP survey over 7km of combined strike will commence shortly ahead of proposed drill testing of the strongest targets.p.14
Magnetic intensity map of the Bambino and Midrim project area showing fold nose and fold limb target horizons, Cu-Ni soil anomaly symbols sized by concentration (0-3,000 ppm), and named high-grade occurrences including Lac Croche, Alotta, Midrim, Delphi, Patry and Zullo.
Under the Option Agreement, Pivotal may earn 100% of Bambino by paying C$125,000 cash, issuing 9,615,000 shares and completing C$500,000 of exploration expenditure over three years. An initial C$12,500 and 1,923,000 shares were payable on signing, with the balance of the shares subject to shareholder approval. The vendors retain a 2.0% NSR royalty, of which Pivotal may buy back 1% for C$1,000,000.p.14
FORWARD PROGRAMp.14
Pivotal's forward program is focused on growing and converting the Horden Lake Mineral Resource, in parallel with advancing engineering, permitting and community engagement, and continued discovery-focused exploration at Belleterre.p.14
Horden Lakep.14
- Step-out and infill drilling to grow the deposit and convert Inferred material – winter 2026–27
- Pre-Feasibility Study engineering to define the development footprint for permitting - 2027
- Environmental baseline studies – recently completed – to be continued through summer 2027
- Community and stakeholder engagement – ongoing
- Strategic financing assessment – ongoing
Belleterrep.15
- Lorraine Mine East assays – Q4 2026
- Bambino IP survey – commencing early November 2026
- LaForce FLTEM surveys – planned
- Field prospecting and target generation – ongoing
CORPORATE UPDATEp.15
Pivotal's cash position as at 30 September 2026 was $2.444m.p.15
Financial commentaryp.15
The Appendix 5B for the quarter ended 30 September 2026 provides an overview of the Company's financial activities. Exploration expenditure for the quarter was $0.861m for ongoing drilling, development and permitting study work associated with the Company's projects. Corporate and other expenditure for the quarter was $0.079m. The total amount paid to Directors of the Company, their associates and other related parties was $0.090m and includes salary, fees and superannuation.p.15
Securities on issue at 30 September 2026
p.15| Security | Listed on ASX | Unlisted | Total |
|---|---|---|---|
| Fully paid ordinary shares | 1,315,094,494 | - | 1,315,094,494 |
| $0.0425 unlisted options expiring 5 December 2026 | - | 3,000,000 | 3,000,000 |
| $0.04 unlisted options expiring 23 July 2027 | - | 6,000,000 | 6,000,000 |
| $0.011 unlisted options expiring 2 December 2027 | - | 12,000,000 | 12,000,000 |
| $0.03 unlisted options expiring 5 December 2027 | - | 4,000,000 | 4,000,000 |
| $0.0425 unlisted options expiring 5 December 2027 | - | 4,000,000 | 4,000,000 |
| $0.055 unlisted options expiring 5 December 2027 | - | 4,000,000 | 4,000,000 |
| $0.023 unlisted options expiring 22 November 2028 | - | 6,000,000 | 6,000,000 |
| $0.025 unlisted options expiring 22 November 2028 | - | 7,500,000 | 7,500,000 |
| $0.025 unlisted options expiring 22 December 2028 | - | 40,000,000 | 40,000,000 |
| $0.025 unlisted options expiring 7 January 2029 | - | 12,000,000 | 12,000,000 |
| Unlisted performance rights expiring 22 November 2027 | - | 1,832,055 | 1,832,055 |
| Unlisted performance rights expiring 2 December 2030 | - | 9,545,833 | 10,500,000 |
| Total | 1,315,094,494 | 109,877,888 | 1,424,973,382 |
About Pivotal Metalsp.16
Pivotal is developing two major projects at Horden Lake and Belleterre located in the Province of Quebec, Canada. Both represent high quality exploration and development opportunities in a global leading mining jurisdiction.p.16
Our 100% owned Horden Lake project is well advanced with a large copper dominant JORC compliant indicated and inferred mineral resource estimate totalling 52mt @ 1.05% CuEq (Table 5). The September 2026 scoping study demonstrated the potential high returns copper development opportunity, leveraging the simple mining and processing, and benefits of the Tier 1 jurisdiction. There is significant exploration upside potential to compound value of the large predominantly open-pit constrained resource already defined.p.16
Our 100% owned Belleterre Projects consist of a large 199km2 greenstone land package encompassing three key project areas: Midrim-Alotta, Lorraine and Laforce. All projects demonstrate advanced exploration prospects, with multiple very high-grade Cu-Ni-PGM and Au occurrences and targets, historic resources, and some with prior mining. Pivotal is focused on advancing both projects, by generating and drilling new targets for resource definition and growth, alongside technical de-risking to enhance the valuation of its discoveries.p.16
Regional map of the Province of Québec showing the locations of the Horden Lake Project near James Bay and the Belleterre Projects near Rouyn-Noranda, in relation to other regional gold, lithium and base metal mines, deposits and smelters including Eleonore, Detour Lake, Casa Berardi, Dumont, Kirkland Lake, Larder Lake, Malartic and Val d'Or.
Competent Person Statementp.16
Disclosure Statementp.16
This report contains information relating to Exploration Results, Mineral Resources, metallurgical testwork, and a production target and forecast financial information derived from the Horden Lake Scoping Study, which has been extracted from the following ASX announcements: Horden Lake Mineral Resource Estimate, ASX announcement 7 July 2026 "Major Copper Resource Growth at Horden Lake"; Horden Lake metallurgical testwork, ASX announcements 12 March 2025 "Testwork Confirms Excellent Metallurgy at Horden Lake" and 1 September 2026 "Higher Copper Recoveries for Horden Lake"; Horden Lake Scoping Study, ASX announcement 29 September 2026 "Scoping Study Confirms Strong Copper Development Potential of Horden Lake"; Horden Lake exploration and geophysics, ASX announcements 12 February 2025 "Major Conductors Show Game Changing Scale Potential at Horden Lake" and 29 April 2025 "Large Increase in HL Project - Shallow High Grade Cu Deposit".p.16
- Belleterre exploration results, ASX announcements 25 August 2025, 10 June 2026, 2 July 2026, 19 August 2026, 25 September 2026 and 30 October 2026.
Other than as disclosed in those announcements, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of the Mineral Resource Estimate, that all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed. The Company confirms that all material assumptions underpinning the production target, and the forecast financial information derived from the production target, in the Scoping Study announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the original market announcements.p.17
Mineral Resourcesp.17
On 7 July 2026 the Company released an updated mineral resource estimate for the project "Major Copper Resource Growth at Horden Lake" The summary mineral resource estimate is shown in Table 5.p.17
Table 5: Horden Lake 2026 Mineral Resource Estimate Statement
p.17| Category | Tonnes Mt | CuEq % | Cu % | Ni % | Au g/t | Pd g/t | Pt g/t | Ag g/t | Co ppm | CuEq kt | Cu kt | Ni kt | Au koz | Pd koz | Pt koz | Ag koz | Co t |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| In-pit | 45.5 | 1.07 | 0.56 | 0.17 | 0.15 | 0.14 | 0.04 | 10.5 | 134 | 485 | 257 | 79 | 219 | 209 | 65 | 15,336 | 6,121 |
| Out-of-pit | 6.9 | 0.93 | 0.51 | 0.18 | 0.08 | 0.14 | 0.03 | 8.5 | 130 | 64 | 35 | 12 | 18 | 31 | 7 | 1,872 | 898 |
| Total | 52.4 | 1.05 | 0.56 | 0.17 | 0.14 | 0.14 | 0.04 | 10.2 | 134 | 549 | 292 | 91 | 237 | 240 | 72 | 17,208 | 7,019 |
| M&I | 24.3 | 1.17 | 0.67 | 0.18 | 0.15 | 0.15 | 0.04 | 9.2 | 143 | 283 | 163 | 45 | 117 | 114 | 31 | 7,175 | 3,478 |
| Inferred | 28.1 | 0.95 | 0.46 | 0.16 | 0.13 | 0.14 | 0.05 | 11.1 | 126 | 266 | 129 | 46 | 120 | 127 | 41 | 10,033 | 3,540 |
| Total (classification) | 52.4 | 1.05 | 0.56 | 0.17 | 0.14 | 0.14 | 0.04 | 10.2 | 134 | 549 | 292 | 91 | 237 | 240 | 72 | 17,208 | 7,019 |
| In-Pit M&I | 24.2 | 1.17 | 0.67 | 0.18 | 0.15 | 0.15 | 0.04 | 9.2 | 143 | 282 | 163 | 44 | 120 | 116 | 35 | 7,166 | 3,473 |
| In-Pit Inferred | 21.3 | 0.95 | 0.44 | 0.16 | 0.15 | 0.14 | 0.05 | 12.0 | 125 | 203 | 94 | 35 | 105 | 95 | 32 | 232 | 8,173 |
| In-Pit Total | 45.5 | 1.07 | 0.56 | 0.17 | 0.15 | 0.14 | 0.04 | 10.5 | 134 | 485 | 257 | 79 | 219 | 209 | 65 | 15,336 | 6,121 |
Metal Equivalentsp.17
Grade based metal equivalents are reported in line with the 7 July 2026 MRE, which were calculated using the following recovery and metals prices assumptions (Table 6). The metallurgical assumptions are informed by recent metallurgical testwork.p.17
Table 6: Metal equivalent parameters
p.17| Metal | Unit | Price | Recovery | Sales Cost | ME Factor |
|---|---|---|---|---|---|
| Copper | USD/t | 11,000 | 90% | 1,100 | 1.00 |
| Nickel | USD/t | 17,500 | 55% | 1,750 | 0.97 |
| Gold | USD/oz | 4,000 | 60% | 400 | 0.78 |
| Palladium | USD/oz | 1,500 | 55% | 150 | 0.27 |
| Platinum | USD/oz | 1,750 | 40% | 175 | 0.23 |
| Silver | USD/oz | 60 | 65% | 6 | 0.013 |
| Cobalt | USD/t | 45,000 | 40% | 4,500 | 0.0002 |
Copper equivalent is calculated based on the formula: CuEq% = Cu% + Ni% * 0.97 + Au ppm * 0.78 + Pd ppm * 0.27 + Pt ppm * 0.23 + Ag ppm * 0.0013 + Co ppm * 0.0002.p.18
Production based metal equivalents are calculated as follows: USD$ NSR / copper price. In the opinion of the Company, all elements included in the metal equivalent calculation have a reasonable potential to be sold and recovered, based on current market conditions, metallurgical testwork, and the Company's metallurgical consultant's experience. Copper is chosen as the equivalent metal due to its dominant economic average weighting at the assumptions stated, which is consistent across the deposit area.p.18
Forward Looking Statements Disclaimerp.18
Schedule of Exploration Tenementsp.19
Schedule of Exploration Tenements - Interest Held at 30 June 2026 and 30 September 2026
p.19| Project Name | Claim Number | Interest Held @ 30-June-26 | Interests in mining tenements acquired increased or lapsed, relinquished reduced | Interest Held @ 30-Sept-26 |
|---|---|---|---|---|
| Alotta-Delphi | 1131092 | 100% | 0% | 100% |
| Alotta-Delphi | 1131093 | 100% | 0% | 100% |
| Alotta-Delphi | 1131094 | 100% | 0% | 100% |
| Alotta-Delphi | 1131116 | 100% | 0% | 100% |
| Alotta-Delphi | 1131117 | 100% | 0% | 100% |
| Alotta-Delphi | 1131118 | 100% | 0% | 100% |
| Alotta-Delphi | 1131119 | 100% | 0% | 100% |
| Alotta-Delphi | 1131120 | 100% | 0% | 100% |
| Alotta-Delphi | 1131127 | 100% | 0% | 100% |
| Alotta-Delphi | 1131128 | 100% | 0% | 100% |
| Alotta-Delphi | 1131129 | 100% | 0% | 100% |
| Alotta-Delphi | 1131130 | 100% | 0% | 100% |
| Alotta-Delphi | 1131131 | 100% | 0% | 100% |
| Alotta-Delphi | 1131132 | 100% | 0% | 100% |
| Alotta-Delphi | 1131133 | 100% | 0% | 100% |
| Horden Lake | 2142253 | 100% | 0% | 100% |
| Horden Lake | 2142255 | 100% | 0% | 100% |
| Horden Lake | 2142256 | 100% | 0% | 100% |
| Horden Lake | 2167543 | 100% | 0% | 100% |
| Horden Lake | 2167544 | 100% | 0% | 100% |
| Horden Lake | 2167548 | 100% | 0% | 100% |
| Horden Lake | 2167549 | 100% | 0% | 100% |
| Horden Lake | 2167550 | 100% | 0% | 100% |
| Horden Lake | 2167551 | 100% | 0% | 100% |
| Horden Lake | 2345934 | 100% | 0% | 100% |
| Horden Lake | 2345935 | 100% | 0% | 100% |
| Horden Lake | 2345936 | 100% | 0% | 100% |
| Horden Lake | 2345937 | 100% | 0% | 100% |
| Horden Lake | 2345938 | 100% | 0% | 100% |
| Horden Lake | 2345939 | 100% | 0% | 100% |
| Horden Lake | 2345940 | 100% | 0% | 100% |
| Horden Lake | 2345941 | 100% | 0% | 100% |
| Horden Lake | 2345942 | 100% | 0% | 100% |
| Horden Lake | 2853304 | 100% | 0% | 100% |
| Horden Lake | 2853305 | 100% | 0% | 100% |
| Horden Lake | 2853306 | 100% | 0% | 100% |
| Horden Lake | 2853307 | 100% | 0% | 100% |
| Lac Katutu | 2835142 | 100% | 0% | 100% |
| Lac Katutu | 2835143 | 100% | 0% | 100% |
| Lac Katutu | 2866175 | 100% | 0% | 100% |
| Lac Katutu | 2866176 | 100% | 0% | 100% |
| Lac Katutu | 2866177 | 100% | 0% | 100% |
| LaForce | 1131335 | 100% | 0% | 100% |
| LaForce | 1131336 | 100% | 0% | 100% |
| LaForce | 1131337 | 100% | 0% | 100% |
| LaForce | 1131339 | 100% | 0% | 100% |
| LaForce | 1131340 | 100% | 0% | 100% |
| LaForce | 1131341 | 100% | 0% | 100% |
| LaForce | 1131345 | 100% | 0% | 100% |
| LaForce | 2402370 | 100% | 0% | 100% |
| LaForce | 2402371 | 100% | 0% | 100% |
| LaForce | 2402372 | 100% | 0% | 100% |
| LaForce | 2402373 | 100% | 0% | 100% |
| LaForce | 2402374 | 100% | 0% | 100% |
| LaForce | 2402375 | 100% | 0% | 100% |
| LaForce | 2402376 | 100% | 0% | 100% |
| LaForce | 2402377 | 100% | 0% | 100% |
| LaForce | 2402378 | 100% | 0% | 100% |
| LaForce | 2402379 | 100% | 0% | 100% |
| LaForce | 2402380 | 100% | 0% | 100% |
| LaForce | 2402381 | 100% | 0% | 100% |
| LaForce | 2402382 | 100% | 0% | 100% |
| LaForce | 2402383 | 100% | 0% | 100% |
| LaForce | 2402384 | 100% | 0% | 100% |
| LaForce | 2402385 | 100% | 0% | 100% |
| LaForce | 2402386 | 100% | 0% | 100% |
| Laverlochere | 2850355 | 0% | 100% | 100% |
| Laverlochere | 2850356 | 0% | 100% | 100% |
| Lorraine | 2321353 | 100% | 0% | 100% |
| Lorraine | 2321354 | 100% | 0% | 100% |
| Lorraine | 2363761 | 100% | 0% | 100% |
| Lorraine | 2369438 | 100% | 0% | 100% |
| Lorraine | 2369439 | 100% | 0% | 100% |
| Lorraine | 2369440 | 100% | 0% | 100% |
| Lorraine | 2391074 | 100% | 0% | 100% |
| Lorraine | 2391075 | 100% | 0% | 100% |
| Lorraine | 2395341 | 100% | 0% | 100% |
| Lorraine | 2395342 | 100% | 0% | 100% |
| Lorraine | 2395343 | 100% | 0% | 100% |
| Lorraine | 2395344 | 100% | 0% | 100% |
| Lorraine | 2395345 | 100% | 0% | 100% |
| Lorraine | 2395346 | 100% | 0% | 100% |
| Lorraine | 2395355 | 100% | 0% | 100% |
| Lorraine | 2395356 | 100% | 0% | 100% |
| Lorraine | 2395357 | 100% | 0% | 100% |
| Lorraine | 2401159 | 100% | 0% | 100% |
| Lorraine | 2401160 | 100% | 0% | 100% |
| Lorraine | 2402022 | 100% | 0% | 100% |
| Lorraine | 2402023 | 100% | 0% | 100% |
| Lorraine | 2402024 | 100% | 0% | 100% |
| Lorraine | 2402025 | 100% | 0% | 100% |
| Lorraine | 2402026 | 100% | 0% | 100% |
| Lorraine | 2406736 | 100% | 0% | 100% |
| Lorraine | 2411844 | 100% | 0% | 100% |
| Lorraine | 2415020 | 100% | 0% | 100% |
| Lorraine | 2415021 | 100% | 0% | 100% |
| Lorraine | 2415022 | 100% | 0% | 100% |
| Lorraine | 2415023 | 100% | 0% | 100% |
| Lorraine | 2415024 | 100% | 0% | 100% |
| Lorraine | 2415025 | 100% | 0% | 100% |
| Lorraine | 2415026 | 100% | 0% | 100% |
| Lorraine | 2415027 | 100% | 0% | 100% |
| Lorraine | 2415028 | 100% | 0% | 100% |
| Lorraine | 2415029 | 100% | 0% | 100% |
| Lorraine | 2415030 | 100% | 0% | 100% |
| Lorraine | 2415031 | 100% | 0% | 100% |
| Lorraine | 2415032 | 100% | 0% | 100% |
| Lorraine | 2415033 | 100% | 0% | 100% |
| Lorraine | 2415034 | 100% | 0% | 100% |
| Lorraine | 2415035 | 100% | 0% | 100% |
| Lorraine | 2415036 | 100% | 0% | 100% |
| Lorraine | 2415037 | 100% | 0% | 100% |
| Lorraine | 2415038 | 100% | 0% | 100% |
| Lorraine | 2415039 | 100% | 0% | 100% |
| Lorraine | 2415040 | 100% | 0% | 100% |
| Lorraine | 2415041 | 100% | 0% | 100% |
| Lorraine | 2415042 | 100% | 0% | 100% |
| Lorraine | 2415043 | 100% | 0% | 100% |
| Lorraine | 2415044 | 100% | 0% | 100% |
| Lorraine | 2415045 | 100% | 0% | 100% |
| Lorraine | 2415046 | 100% | 0% | 100% |
| Lorraine | 2415047 | 100% | 0% | 100% |
| Lorraine | 2415048 | 100% | 0% | 100% |
| Lorraine | 2415049 | 100% | 0% | 100% |
| Lorraine | 2415050 | 100% | 0% | 100% |
| Lorraine | 2415051 | 100% | 0% | 100% |
| Lorraine | 2415052 | 100% | 0% | 100% |
| Lorraine | 2415053 | 100% | 0% | 100% |
| Lorraine | 2415054 | 100% | 0% | 100% |
| Lorraine | 2415055 | 100% | 0% | 100% |
| Lorraine | 2415056 | 100% | 0% | 100% |
| Lorraine | 2415238 | 100% | 0% | 100% |
| Lorraine | 2415239 | 100% | 0% | 100% |
| Lorraine | 2415240 | 100% | 0% | 100% |
| Lorraine | 2415241 | 100% | 0% | 100% |
| Lorraine | 2415242 | 100% | 0% | 100% |
| Lorraine | 2415243 | 100% | 0% | 100% |
| Lorraine | 2415244 | 100% | 0% | 100% |
| Lorraine | 2415245 | 100% | 0% | 100% |
| Lorraine | 2415246 | 100% | 0% | 100% |
| Lorraine | 2415247 | 100% | 0% | 100% |
| Lorraine | 2460442 | 100% | 0% | 100% |
| Lorraine | 2460443 | 100% | 0% | 100% |
| Lorraine | 2460444 | 100% | 0% | 100% |
| Lorraine | 2467148 | 100% | 0% | 100% |
| Lorraine | 2497739 | 100% | 0% | 100% |
| Lorraine | 2497740 | 100% | 0% | 100% |
| Lorraine | 2497741 | 100% | 0% | 100% |
| Lorraine | 2497742 | 100% | 0% | 100% |
| Lorraine | 2497743 | 100% | 0% | 100% |
| Lorraine | 2497744 | 100% | 0% | 100% |
| Lorraine | 2497745 | 100% | 0% | 100% |
| Lorraine | 2502524 | 100% | 0% | 100% |
| Lorraine | 2502525 | 100% | 0% | 100% |
| Lorraine | 2502526 | 100% | 0% | 100% |
| Lorraine | 2502527 | 100% | 0% | 100% |
| Lorraine | 2502528 | 100% | 0% | 100% |
| Lorraine | 2502529 | 100% | 0% | 100% |
| Lorraine | 2540452 | 100% | 0% | 100% |
| Lorraine | 2540453 | 100% | 0% | 100% |
| Lorraine | 2540454 | 100% | 0% | 100% |
| Lorraine | 2540455 | 100% | 0% | 100% |
| Lorraine | 2540456 | 100% | 0% | 100% |
| Lorraine | 2540457 | 100% | 0% | 100% |
| Lorraine | 2541509 | 100% | 0% | 100% |
| Lorraine | 2541510 | 100% | 0% | 100% |
| Lorraine | 2541511 | 100% | 0% | 100% |
| Lorraine | 2541512 | 100% | 0% | 100% |
| Lorraine | 2541513 | 100% | 0% | 100% |
| Lorraine | 2541514 | 100% | 0% | 100% |
| Lorraine | 2541515 | 100% | 0% | 100% |
| Lorraine | 2541516 | 100% | 0% | 100% |
| Lorraine | 2544398 | 100% | 0% | 100% |
| Lorraine | 2544402 | 100% | 0% | 100% |
| Lorraine | 2544404 | 100% | 0% | 100% |
| Lorraine | 2544405 | 100% | 0% | 100% |
| Lorraine | 2544406 | 100% | 0% | 100% |
| Lorraine | 2544407 | 100% | 0% | 100% |
| Lorraine | 2544408 | 100% | 0% | 100% |
| Lorraine | 2544409 | 100% | 0% | 100% |
| Lorraine | 2544411 | 100% | 0% | 100% |
| Lorraine | 2544412 | 100% | 0% | 100% |
| Lorraine | 2572719 | 100% | 0% | 100% |
| Lorraine | 2572720 | 100% | 0% | 100% |
| Lorraine | 2572721 | 100% | 0% | 100% |
| Lorraine | 2572722 | 100% | 0% | 100% |
| Lorraine | 2572723 | 100% | 0% | 100% |
| Lorraine | 2572724 | 100% | 0% | 100% |
| Lorraine | 2572725 | 100% | 0% | 100% |
| Lorraine | 2572726 | 100% | 0% | 100% |
| Lorraine | 2572727 | 100% | 0% | 100% |
| Lorraine | 2572728 | 100% | 0% | 100% |
| Lorraine | 2572729 | 100% | 0% | 100% |
| Lorraine | 2572730 | 100% | 0% | 100% |
| Lorraine | 2572731 | 100% | 0% | 100% |
| Lorraine | 2572732 | 100% | 0% | 100% |
| Lorraine | 2572733 | 100% | 0% | 100% |
| Lorraine | 2572734 | 100% | 0% | 100% |
| Lorraine | 2572735 | 100% | 0% | 100% |
| Lorraine | 2572736 | 100% | 0% | 100% |
| Lorraine | 2572737 | 100% | 0% | 100% |
| Lorraine | 2804559 | 100% | 0% | 100% |
| Lorraine | 2804560 | 100% | 0% | 100% |
| Lorraine | 2804561 | 100% | 0% | 100% |
| Lorraine | 2804562 | 100% | 0% | 100% |
| Lorraine | 2804563 | 100% | 0% | 100% |
| Lorraine | 2804564 | 100% | 0% | 100% |
| Lorraine | 2804565 | 100% | 0% | 100% |
| Lorraine | 2804566 | 100% | 0% | 100% |
| Lorraine | 2804567 | 100% | 0% | 100% |
| Lorraine | 2804568 | 100% | 0% | 100% |
| Lorraine | 2804569 | 100% | 0% | 100% |
| Lorraine | 2804570 | 100% | 0% | 100% |
| Lorraine | 2804571 | 100% | 0% | 100% |
| Lorraine | 2804572 | 100% | 0% | 100% |
| Lorraine | 2804573 | 100% | 0% | 100% |
| Lorraine | 2804574 | 100% | 0% | 100% |
| Lorraine | 2804575 | 100% | 0% | 100% |
| Lorraine | 2804576 | 100% | 0% | 100% |
| Lorraine | 2804577 | 100% | 0% | 100% |
| Lorraine | 2804578 | 100% | 0% | 100% |
| Lorraine | 2804579 | 100% | 0% | 100% |
| Lorraine | 2804580 | 100% | 0% | 100% |
| Lorraine | 2804581 | 100% | 0% | 100% |
| Lorraine | 2804582 | 100% | 0% | 100% |
| Lorraine | 2804583 | 100% | 0% | 100% |
| Lorraine | 2854744 | 100% | 0% | 100% |
| Lorraine | 2854745 | 100% | 0% | 100% |
| Midrim | 2412147 | 100% | 0% | 100% |
| Midrim | 2412148 | 100% | 0% | 100% |
| Midrim | 2412149 | 100% | 0% | 100% |
| Midrim | 2412150 | 100% | 0% | 100% |
| Midrim | 2412151 | 100% | 0% | 100% |
| Midrim | 2412152 | 100% | 0% | 100% |
| Midrim | 2412153 | 100% | 0% | 100% |
| Midrim | 2412154 | 100% | 0% | 100% |
| Midrim | 2412155 | 100% | 0% | 100% |
| Midrim | 2412156 | 100% | 0% | 100% |
| Midrim | 2412157 | 100% | 0% | 100% |
| Midrim | 2412158 | 100% | 0% | 100% |
| Midrim | 2412159 | 100% | 0% | 100% |
| Midrim | 2412160 | 100% | 0% | 100% |
| Midrim | 2412161 | 100% | 0% | 100% |
| Midrim | 2412162 | 100% | 0% | 100% |
| Midrim | 2412163 | 100% | 0% | 100% |
| Midrim | 2412164 | 100% | 0% | 100% |
| Midrim | 2412165 | 100% | 0% | 100% |
| Midrim | 2412167 | 100% | 0% | 100% |
| Midrim | 2412168 | 100% | 0% | 100% |
| Midrim | 2412169 | 100% | 0% | 100% |
| Midrim | 2412170 | 100% | 0% | 100% |
| Midrim | 2412171 | 100% | 0% | 100% |
| Midrim | 2412172 | 100% | 0% | 100% |
| Midrim | 2412173 | 100% | 0% | 100% |
| Midrim | 2412174 | 100% | 0% | 100% |
| Midrim | 2412175 | 100% | 0% | 100% |
| Midrim | 2412176 | 100% | 0% | 100% |
| Midrim | 2412177 | 100% | 0% | 100% |
| Midrim | 2412178 | 100% | 0% | 100% |
| Midrim | 2412179 | 100% | 0% | 100% |
| Midrim | 2412180 | 100% | 0% | 100% |
| Midrim | 2412181 | 100% | 0% | 100% |
| Midrim | 2412182 | 100% | 0% | 100% |
| Midrim | 2412183 | 100% | 0% | 100% |
| Midrim | 2412184 | 100% | 0% | 100% |
| Midrim | 2412185 | 100% | 0% | 100% |
| Midrim | 2412186 | 100% | 0% | 100% |
| Midrim | 2412187 | 100% | 0% | 100% |
| Midrim | 2412188 | 100% | 0% | 100% |
| Midrim | 2412189 | 100% | 0% | 100% |
| Midrim | 2412190 | 100% | 0% | 100% |
| Midrim | 2412191 | 100% | 0% | 100% |
| Midrim | 2412192 | 100% | 0% | 100% |
| Midrim | 2412193 | 100% | 0% | 100% |
| Midrim | 2412195 | 100% | 0% | 100% |
| Midrim | 2412196 | 100% | 0% | 100% |
| Midrim | 2412197 | 100% | 0% | 100% |
| Midrim | 2412198 | 100% | 0% | 100% |
| Midrim | 2412199 | 100% | 0% | 100% |
| Midrim | 2412200 | 100% | 0% | 100% |
| Midrim | 2412201 | 100% | 0% | 100% |
| Midrim | 2412202 | 100% | 0% | 100% |
| Midrim | 2412203 | 100% | 0% | 100% |
| Midrim | 2412204 | 100% | 0% | 100% |
| Midrim | 2412205 | 100% | 0% | 100% |
| Midrim | 2412206 | 100% | 0% | 100% |
| Midrim | 2412207 | 100% | 0% | 100% |
| Midrim | 2499890 | 100% | 0% | 100% |
| Midrim | 2499891 | 100% | 0% | 100% |
| Midrim | 2499895 | 100% | 0% | 100% |
| Midrim | 2499896 | 100% | 0% | 100% |
| Midrim | 2499900 | 100% | 0% | 100% |
| Midrim | 2499901 | 100% | 0% | 100% |
| Midrim | 2499902 | 100% | 0% | 100% |
| Midrim | 2499903 | 100% | 0% | 100% |
| Midrim | 2499904 | 100% | 0% | 100% |
| Midrim | 2499905 | 100% | 0% | 100% |
| Midrim | 2499906 | 100% | 0% | 100% |
| Midrim | 2499907 | 100% | 0% | 100% |
| Midrim | 2499908 | 100% | 0% | 100% |
| Midrim | 2499909 | 100% | 0% | 100% |
| Midrim | 2499910 | 100% | 0% | 100% |
| Midrim | 2499911 | 100% | 0% | 100% |
| Midrim | 2499912 | 100% | 0% | 100% |
| Midrim | 2499913 | 100% | 0% | 100% |
| Midrim | 2499914 | 100% | 0% | 100% |
| Midrim | 2499915 | 100% | 0% | 100% |
| Midrim | 2499916 | 100% | 0% | 100% |
| Midrim | 2499917 | 100% | 0% | 100% |
| Midrim | 2499918 | 100% | 0% | 100% |
| Midrim | 2499921 | 100% | 0% | 100% |
| Midrim | 2499922 | 100% | 0% | 100% |
| Midrim | 2499926 | 100% | 0% | 100% |
| Midrim | 2499927 | 100% | 0% | 100% |
| Midrim | 2499928 | 100% | 0% | 100% |
| Midrim | 2499929 | 100% | 0% | 100% |
| Midrim | 2499933 | 100% | 0% | 100% |
| Midrim | 2860774 | 100% | 0% | 100% |
| Midrim | 2868579 | 100% | 0% | 100% |
| Midrim | 2871528 | 100% | 0% | 100% |
| Zullo | 2466858 | 100% | 0% | 100% |
| Zullo | 2800382 | 100% | 0% | 100% |
| Zullo | 2800383 | 100% | 0% | 100% |
Appendix 5B - Mining exploration entity or oil and gas exploration entity quarterly cash flow reportp.24
Entity details
p.24| Field | Value |
|---|---|
| Name of entity | Pivotal Metals Limited |
| ABN | 49 623 130 987 |
| Quarter ended ("current quarter") | 30 September 2026 |
Consolidated statement of cash flows - Operating and Investing Activities (part 1)
p.24| Item | Description | Current quarter $A'000 | Year to date (3 months) $A'000 |
|---|---|---|---|
| 1.1 | Receipts from customers | - | - |
| 1.2(a) | Payments for exploration & evaluation | - | - |
| 1.2(b) | Payments for development | - | - |
| 1.2(c) | Payments for production | - | - |
| 1.2(d) | Payments for staff costs | (90) | (90) |
| 1.2(e) | Payments for administration and corporate costs | (79) | (79) |
| 1.3 | Dividends received | - | - |
| 1.4 | Interest received | 25 | 25 |
| 1.5 | Interest and other costs of finance paid | - | - |
| 1.6 | Income taxes paid | - | - |
| 1.7 | Government grants and tax incentives | - | - |
| 1.8 | Other | - | - |
| 1.9 | Net cash from / (used in) operating activities | (144) | (144) |
| 2.1(a) | Payments to acquire entities | - | - |
| 2.1(b) | Payments to acquire tenements | (13) | (13) |
| 2.1(c) | Payments to acquire property, plant and equipment | - | - |
| 2.1(d) | Payments to acquire exploration & evaluation | (861) | (861) |
| 2.1(e) | Payments to acquire investments | - | - |
| 2.1(f) | Payments to acquire other non-current assets | - | - |
Consolidated statement of cash flows - Investing and Financing Activities (part 2)
p.25| Item | Description | Current quarter $A'000 | Year to date (3 months) $A'000 |
|---|---|---|---|
| 2.2(a) | Proceeds from disposal of entities | - | - |
| 2.2(b) | Proceeds from disposal of tenements | - | - |
| 2.2(c) | Proceeds from disposal of property, plant and equipment | - | - |
| 2.2(d) | Proceeds from disposal of investments | - | - |
| 2.2(e) | Proceeds from disposal of other non-current assets | - | - |
| 2.3 | Cash flows from loans to other entities | - | - |
| 2.4 | Dividends received | - | - |
| 2.5 | Other | - | - |
| 2.6 | Net cash from / (used in) investing activities | (874) | (874) |
| 3.1 | Proceeds from issues of equity securities | - | - |
| 3.2 | Proceeds from issue of convertible debt securities | - | - |
| 3.3 | Proceeds from exercise of options | - | - |
| 3.4 | Transaction costs related to issues of equity securities or convertible debt securities | - | - |
| 3.5 | Proceeds from borrowings | - | - |
| 3.6 | Repayment of borrowings | - | - |
| 3.7 | Transaction costs related to loans and borrowings | - | - |
| 3.8 | Dividends paid | - | - |
| 3.9 | Other (proceeds from equity securities not yet issued) | - | - |
| 3.10 | Net cash from / (used in) financing activities | - | - |
| 4.1 | Cash and cash equivalents at beginning of period | 3,482 | 3,482 |
| 4.2 | Net cash from / (used in) operating activities | (144) | (144) |
| 4.3 | Net cash from / (used in) investing activities | (874) | (874) |
| 4.4 | Net cash from / (used in) financing activities | - | - |
Cash reconciliation, related party payments
p.26| Item | Description | Current quarter $A'000 | Previous quarter $A'000 |
|---|---|---|---|
| 4.5 | Effect of movement in exchange rates on cash held | (20) | (20) |
| 4.6 | Cash and cash equivalents at end of period | 2,444 | 2,444 |
| 5.1 | Bank balances | 1,083 | 1,826 |
| 5.2 | Call deposits | 1,361 | 1,656 |
| 5.3 | Bank overdrafts | - | - |
| 5.4 | Other | - | - |
| 5.5 | Cash and cash equivalents at end of quarter | 2,444 | 3,482 |
Payments to related parties of the entity and their associates
p.26| Item | Description | Current quarter $A'000 |
|---|---|---|
| 6.1 | Aggregate amount of payments to related parties and their associates included in item 1 | 90 |
| 6.2 | Aggregate amount of payments to related parties and their associates included in item 2 | - |
Includes Director salaries, fees and superannuation.p.26
Financing facilities
p.27| Item | Description | Total facility amount at quarter end $A'000 | Amount drawn at quarter end $A'000 |
|---|---|---|---|
| 7.1 | Loan facilities | - | - |
| 7.2 | Credit standby arrangements | - | - |
| 7.3 | Other (funding agreement convertible securities) | - | - |
| 7.4 | Total financing facilities | - | - |
| 7.5 | Unused financing facilities available at quarter end | - | - |
Estimated cash available for future operating activities
p.27| Item | Description | $A'000 |
|---|---|---|
| 8.1 | Net cash from / (used in) operating activities | (144) |
| 8.2 | Payments for exploration & evaluation classified as investing activities | (861) |
| 8.3 | Total relevant outgoings | (1,005) |
| 8.4 | Cash and cash equivalents at quarter end | 2,444 |
| 8.5 | Unused finance facilities available at quarter end | - |
| 8.6 | Total available funding | 2,444 |
| 8.7 | Estimated quarters of funding available | 2.4 |
Answers to items 8.8.1, 8.8.2 and 8.8.3 are not applicable as item 8.7 (2.4 quarters) is not less than 2 quarters.p.27
Compliance statement: This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. This statement gives a true and fair view of the matters disclosed. Date: 30 October 2026. Authorised by: By the Board.p.28
Forward-Looking Statements
Step-out and infill drilling to grow the deposit and convert Inferred material at Horden Lake, planned for winter 2026–27.
Pre-Feasibility Study engineering to define the development footprint for permitting in 2027.
Environmental baseline studies to be continued through summer 2027.
Ongoing community and stakeholder engagement.
Ongoing strategic financing assessment, including non-equity financing options.
Lorraine Mine East assays expected Q4 2026.
Bambino IP survey commencing early November 2026.
LaForce FLTEM surveys planned.
Assays for holes 26-PIV-12 and 26-PIV-13 expected by early December 2026.